Astor Street Condo

We had a tight time line, a limited window each day to be able to work and a small elevator.

I love a challenge.

This is a great building. Built when there were not a lot of electrical gadgets, appliances were limited and plumbing codes were different.

Did I say I love a challenge. Start to finish 22 days.

It turned out beautiful. Demoed out, new floors, new master bath, new kitchen (opened up completely), new lighting, paint and tile in hall bath.

Before and After Astor Condo Kitchen

A Before and After in the kitchen. The before kitchen was five cabinets and 4′ x 14′. We took out the wall, got creative with a wood soffit for new lighting, tripled the size of the kitchen and the island is 4′ x 8′ Artic White Quartzite.

 

Astor Kitchen IMG_2768

 

 

Astor Kitchen

Astor Kitchen

Astor Condo Master Bath

Astor Condo Master Bath

IMG_2781

IMG_2778

Leave a Reply

Fill in your details below or click an icon to log in:

You are commenting using your WordPress.com account. Log Out / Change )

You are commenting using your Twitter account. Log Out / Change )

You are commenting using your Facebook account. Log Out / Change )

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 1,324 other followers

%d bloggers like this: